AS EASY AS CHILD’S PLAY
  • Video
  • Naujienos ir akcijos
    2019m. Naujiena Fasadų adpailos sprendimai iš WPC. 01_Titel-2_ret-d72e403a HB_Fassade-3cf9dee7

Atvira terasa su Fix Step

open-construction01

A journey of discovery

Open decks can be laid in two ways depending on use: above ground or level with the ground. Transitions to the threshold do not require steps if the deck is above ground. The sublime structure of this deck version can be complemented visually with megawood smooth edge boards. Download this PDF for the entire laying process as well as other important information. You can also see the installation process here as a video.

open-construction02

FIX STEP – Floor level construction only in the form of an open deck

In order to ensure the required ventilation from underneath, a floor level construction is only recommended in the form of an open deck. A 2 cm distance between the floorboards and the edges of the lawn must always be observed.

open-construction03